Awards Participation is free of cost

Participation Open till June 30th

Back to 25th JK AYA
Ar. Md. Ishtiaque Zahir & Ar. Md. Iqbal Habib

Ar. Md. Ishtiaque Zahir & Ar. Md. Iqbal Habib, Dhaka

Winners of Commendation Award - Foreign Countries' Architecture Awards (FCAA)

  • Project Name:

    Dusai Resort & SPA

  • Year of Commencement:

    2010

  • Year of Completions:

    2013

  • Name of Firm:

  • Location:

    Bangladesh

  • Size:

    133972 sq.ft

  • Project type:

    Hospitality Building

Project Description

NAME OF THE PROJECT : Dusai Resort & Spa, Moulovi Bazar, Sylhet, Bangladesh

BUILT IN AREA: 11103.42 sq. m.

PROJECT DESCRIPTION

Dusai Resort & Spa is a destination resort equipped to serve more than 180 guests at a time with guest living facilities of 80 rooms, 3 restaurants, children’s playground facilities, swimming pool, spa, convention hall etc . Guestrooms are nested on top of the hillocks while the services and walkways are placed in the valleys.

Program:

Reception Hall Wing, equipped with car drop, open lounge facilities and back office. The open pavilion like structure floats in the water surrounding the reception area.

Convention Centre and Motel Wing, equipped to accommodate 60 guests with 20 rooms and a convention hall for 70 persons for meetings

and events with dining facility.

Main hotel, located at the central area consisting 30 rooms for 60 guests. It also accommodates back of house facilities and main kitchen and laundry facilities in the semi basement area.

4 Suite Villas, accommodates 40 guests in Duplex and Triplex with 2 no. of bedroom suites in each villa.

5 Deluxe Villas, accommodating 48 guests in 24 rooms, each villa consisting independent 4 guest rooms

2 Presidential Villas, of independent cottages with separate guest rooms

Spa with 6 treatment rooms with the view of the hills

3 Thematic Restaurants with dining and all equipped kitchen facilities

Boat Station, docking 10 boats.

Gym, for 6 users with locker room and changing facility for male and female and steam bath.

Parking with 55 car parking facilities with 4 minivans along with drivers waiting shed.

Drivers Dormitory for 10 person in 3 rooms.

Children’s Play Area in the valley for the enjoyment of different age group of children

Swimming pool in 3 tiers. First tier consisting Jacuzzi pool, in second relaxing pool and at the end lap pool with heating facilities. It has large deck area and a sunken café.

Guest Maid Dormitory for 12 persons

Mosque for 100 persons

GM & Executive Quarters for 16 Executives

Staff Accommodation Blog with 16 rooms accommodating 70 staffs

Existing Owners Bungalow

Golf Lounge And Bar

Utility Blog for electro mechanical facilities.

MATERIALS

The project construction materials comprise of locally available materials combined with indigenous construction techniques. Concrete structure infills are comprised of brick walls. Outdoor facade rendered with fair face cement plaster and indoor facades comprises of regular cement mortar plaster rendered and painted. All floors are finished with homogenous matt finished tiles & Villas have wooden floors. General ceilings are cement plastered and finished with paint and some parts are dry gypsum plaster finished.

All the upper floors of the villas and the valley restaurant have exposed roof structure with bamboo & thatch roof ceiling. In some public spaces comprise exposed roof structure with wood and wood veneered finished ceiling. The hand rails grab bars and doors are made with locally acquired aged walnut colored solid wood. All out door surfaces are natural finish so that it blends well with the surrounding green nature. Pitch roofs are a mix of handmade mud tiles and thatch roof with high pitch varying 24-40 degree slope to withhold the heavy rain during monsoon.

If you want explore

Winner’s Since Beginning